Construction Division / Office & Commercial Fit-Out
Division 02 — Construction

Office & Commercial Fit-Out

Open plan, private offices, conference rooms, and server rooms — tenant fit-out to brand standards and building code for commercial office and professional space.

What we deliver

Our Office capabilities

Open Plan & Collaborative Spaces

Framing, MEP rough-in, ceilings, flooring, and glass wall systems for modern open-plan office environments. Lighting control, data infrastructure, and AV rough-in coordinated with your IT team.

Private Office & Boardroom

Private office suites, executive spaces, and boardrooms with acoustic wall systems, custom millwork, and A/V integration — built to the specification your interior designer intended.

Server Rooms & IT Infrastructure

Raised floor systems, dedicated cooling, generator-backed UPS power, cable management, and security access for IT rooms and small data centers within your office footprint.

Commercial corridor interior Retail interior build-out Construction team
Who we serve

Ideal for these applications

Law Firms & Professional Services

Private office configurations with high acoustic performance requirements, security access, and client-facing conference space.

Technology Companies

Collaborative open-plan offices with flexible furniture infrastructure, abundant power and data, and amenity spaces to attract talent.

Medical & Healthcare Offices

Medical office fit-out with plumbing for exam rooms, medical gas rough-in, HIPAA-compliant layout configurations, and ICRA infection control during construction.

Co-Working & Flex Office

Multi-tenant co-working fit-out with private offices, open desk areas, phone booths, and shared conference facilities requiring phased delivery.

How it works

Our office process

01

Space Planning Review

We review the architect's construction documents for constructability, coordinate with the building's base building contractor or property manager, and identify long-lead items.

02

MEP Rough-In

HVAC distribution, electrical rough-in, plumbing (if required), fire alarm, and data conduit — coordinated and inspected before any walls are closed.

03

Finishes

Metal stud framing, drywall, tape, paint, flooring, ceilings, doors, and hardware installed per the finish schedule and specifications.

04

Commissioning & Handoff

Lighting controls programmed, HVAC balanced, final clean, punch list complete, and space handed to the tenant with keys and warranty documentation.

Common questions

Frequently asked

How long does a typical office fit-out take?

A 5,000 SF office fit-out typically runs 6–8 weeks from permit issuance to occupancy. Larger or more complex spaces, or those requiring custom millwork or specialty systems, run longer.

Do you coordinate with the building's base building contractor?

Yes — tenant improvement work in multi-tenant buildings requires coordination with the base building MEP systems, access to building risers, and property manager approval. We manage all of these interfaces.

Can you work after hours to minimize business disruption?

In occupied buildings, we can schedule noisy or disruptive work during off-hours and weekends. This adds some cost but is often the right approach when adjacent tenant operations must continue.

Construction Division

Ready to build out
your office space?

From demising walls to full tenant finish, our crews deliver commercial office build-outs on schedule with no surprises.

Get a Free Quote All Construction Services
  • Design-build available
  • Tenant improvement specialists
  • 12-state service area