Commercial Renovation & Remodel
Interior demolition, reconfiguration, and finish upgrades for occupied and unoccupied commercial buildings of all types.
Our Commercial Renovation capabilities
Occupied Building Renovation
Phased renovation with a detailed logistics plan to keep your business running during construction. Dust barriers, temporary partitions, and off-hours work sequencing to minimize disruption to tenants and employees.
Structural Modifications
Load-bearing wall removals, opening additions, mezzanine construction, and floor reinforcements — all with structural engineering coordination and inspected to code.
Code & ADA Compliance Upgrades
Accessibility improvements, egress upgrades, fire alarm and sprinkler modifications, and electrical service upgrades triggered by change of use or renovation threshold.
Ideal for these applications
Office Building Repositioning
Convert dated Class B office buildings into modern, amenity-rich Class A spaces to attract new tenants and increase asset value.
Retail Refresh & Rebranding
Brand refresh or remodel of existing retail locations — new storefront, interior reconfiguration, and fixture installation on compressed retail schedules.
Healthcare Facilities
Medical office, clinic, and outpatient facility renovations requiring infection control protocols, ICRA barriers, and coordination with facility management.
Hospitality & Restaurant
Hotel room renovation programs, restaurant remodels, and food service facility upgrades requiring phased delivery and compressed project schedules.
Our commercial renovation process
Existing Conditions Survey
We walk the space and document existing conditions — MEP systems, structural elements, hazardous materials presence, and code compliance status.
Phasing & Logistics Plan
Construction phasing, temporary partition locations, hours of work, and tenant communication plan developed and approved before mobilization.
Construction
Demolition, rough-in, framing, and finishes executed in sequence with daily progress updates and proactive issue resolution.
Punch & Handback
Punch list walkthrough with the owner or tenant, certificate of occupancy amendment if required, and space handed back clean.
Frequently asked
Can you work in occupied buildings?
Yes — a significant portion of our renovation work is in occupied buildings. We develop detailed logistics and phasing plans to keep businesses running throughout construction.
How do you handle hazardous materials like asbestos or lead paint?
We perform visual surveys before demo and engage licensed environmental consultants for testing and abatement when required. We do not proceed with demo until the abatement report is complete.
Do you need to pull new permits for renovations?
Almost always, yes. Interior renovation permits are required for structural changes, MEP modifications, and changes of occupancy. We manage the permit process as part of our GC scope.
Related services
Ready to renovate your
commercial facility?
We manage commercial renovations in occupied and unoccupied facilities, minimizing disruption to your operations.
- Phased renovation available
- After-hours scheduling
- 12-state service area