Energy Division / Utility Service Upgrades
Division 03 — Energy

Utility Service Upgrades

Service entrance, metering, and switchgear upgrades to support increased electrical load from EV charging, solar, battery storage, or building expansion.

What we deliver

Our Utility Service Upgrades capabilities

Service Entrance & Metering

Main service entrance upgrades from 200A to 4,000A including utility coordination, meter socket replacement, main disconnect installation, and AIC-rated overcurrent protection.

Switchgear & Distribution

Low-voltage switchgear, distribution panels, motor control centers, and feeder circuits for new or expanded loads. We design for present load with future capacity built in.

Utility Application Management

We manage the utility service application process — capacity requests, interconnection filings, transformer procurement coordination, and inspection scheduling. This is the most time-consuming part of any electrical expansion project.

EV charging installation Energy systems engineer Commercial facility
Who we serve

Ideal for these applications

EV Charging Expansions

Adding DCFC or large Level 2 charging loads to a commercial property almost always requires a service evaluation and often an upgrade.

Solar & Storage Interconnection

Bidirectional metering, anti-islanding protection, and export limiting configurations required for solar and battery systems connecting to the utility grid.

Building Expansions

New wings, floors, or tenant spaces requiring increased electrical capacity beyond what the existing service can support.

Industrial Load Growth

Manufacturing and industrial facilities adding new equipment, production lines, or HVAC systems that push existing service capacity.

How it works

Our utility service upgrades process

01

Load Study

Existing demand metering review, proposed new load assessment, and service capacity determination — we tell you exactly what size upgrade is needed before any utility applications are filed.

02

Utility Application

Service upgrade application submitted to the utility with load data and proposed equipment specifications. We manage all utility communication and follow up regularly.

03

Design & Permitting

Electrical design drawings and permit application prepared concurrently with utility application to minimize overall project duration.

04

Construction

Service entrance work coordinated with utility for meter pull, new switchgear and distribution installed, and final inspection obtained before power restoration.

Common questions

Frequently asked

How long does a utility service upgrade take?

Simple residential-scale upgrades take 2–4 weeks. Commercial service upgrades requiring new transformers or substation work can take 6–18 months depending on utility backlog and equipment lead times. Starting the utility application early is critical.

Do I need to upgrade my service for Level 2 EV charging?

It depends on your current service size and existing load. Many commercial buildings have headroom for a few Level 2 chargers without any service upgrade. A load study — which we provide free for projects over $50K — determines this definitively.

Can you handle both the utility coordination and the electrical construction?

Yes — and this is a significant advantage. When the same contractor manages both the utility coordination and the electrical installation, there are no interface gaps or finger-pointing if something goes wrong.

Energy Division

Need a utility service
upgrade for your facility?

We handle utility coordination, switchgear replacement, and service entrance upgrades for commercial and industrial facilities.

Get a Free Quote All Energy Services
  • Utility coordination included
  • Multi-state licensed electricians
  • 12-state service area