DC Fast Charging (DCFC) Installation
High-power DC fast charging installation for fleet depots, highway corridors, retail destinations, and commercial hubs.
Our DC Fast Charging (DCFC) Installation capabilities
High-Power EVSE Installation
50kW to 350kW DC fast charger installation for CHAdeMO, CCS, and NACS connectors. We work with ABB, BTC Power, Tritium, and Tesla equipment and follow all manufacturer-specific installation requirements.
Utility Interconnection
We manage the full utility interconnection process — application submission, service entrance design, transformer coordination, and meter installation. This is often the longest lead time item and we start it first.
Civil & Canopy Work
Conduit trenching, charger pad construction, bollard installation, and EV charging canopy construction for weather protection and solar integration at high-traffic fast charging locations.
Ideal for these applications
Highway Corridor Charging
FHWA-compliant DCFC installations along Interstate corridors as part of NEVI-funded public charging networks.
Fleet Depot Charging
High-power charging infrastructure for commercial vehicle, transit bus, and last-mile delivery fleet electrification programs.
Retail Destination Charging
Anchor tenant EV amenity charging at big box retail, grocery, and entertainment destinations where 20–45 minute dwell times match DCFC session lengths.
Hospitality & Hotel
Guest-facing DCFC at hotels and extended stay properties where overnight guests may need a significant charge in less than an hour.
Our dc fast charging (dcfc) installation process
Utility Pre-Application
We submit the utility interconnection pre-application immediately — transformer upgrades and service installations have 6–18 month lead times and must start first.
Civil & Electrical Design
Charging layout, conduit routing, service entrance design, and ADA compliance plan submitted for permitting concurrently with utility application.
Civil & Electrical Construction
Trenching, conduit, switchgear, service entrance, charger pad construction, and bollards installed while utility transformer work proceeds in parallel.
EVSE Installation & Commissioning
Chargers installed, utility connects, network provisioned, and site tested to FHWA or client acceptance standards.
Frequently asked
How long does a DCFC project take from start to finish?
Utility interconnection is the governing path. Simple service upgrades take 3–6 months; new transformer installations can take 12–18 months. We pursue early utility application aggressively to minimize schedule impact.
Can solar and battery storage reduce operating costs at a DCFC site?
Yes — demand charges from high-power DCFC sessions are the largest operating cost. Battery storage (BESS) can dramatically reduce peak demand charges. We design integrated solar+storage+DCFC systems on the same project.
Are your crews NEVI-qualified?
Yes — we follow NEVI program requirements including Qi certification, UL 9741 compliance, and the required documentation for federally funded charging projects.
Related services
Ready to deploy DC Fast
Charging at your location?
From utility coordination to commissioning, we deliver DCFC installations for retail, fleet, and corridor charging applications.